Industrial Layout
The four roads inside the Erdos equipment manufacturing base were contracted by Inner Mongolia Goldway Bridge and Road Corporation, which was 13 km long, with the bidding price of RMB 115 million. The project began in October, 2007 and completed by the end of 2010.